In the construction industry we are all too familiar with those moments, thinking about that upcoming project, what thoughts are running through your mind the most? Delays? Budget? Overall project control?  We would like to introduce or refresh you...

5 Benefits of Primavera P6 Training

Primavera P6 Training Benefits Welcome back to our Primavera P6 training blog. Today we are going to outline five benefits of learning P6. Primavera software is one of the most well known tools in the project management profession. It is the industry standard PPM...

Learn more about the benefits of Primavera P6 PPM

Primavera P6 Professional was engineered to get you operating, planning, and scheduling immediately. With simple and intuitive navigation, you will begin planning, scheduling and controlling your project faster than you even thought possible! To maximize your project...

Primavera P6 Professional Release 82 Attachment Tools

Step 1. Excavation, activity BA2020, has experienced a temporary work stoppage as evident by the bar- necking on the Gantt Chart. Step 2. Document the delay with a Notebook Topic in activity details. Step 3. To add the Curtain, select the View menu Step 3A. Highlight...

Primavera Tutorial : Resource Assignments Window

Primavera P6 Training     Welcome back to our training blog! Today we are going to cover the resource assignments window in Primavera P6. The Resource Assignments window allows you to view and add resource & role assignments to activities in your current projects....

How to manage risk in Primavera P6 Professional

Risk Management in Primavera P6 Release 8.2 Risks are uncertain events/conditions that have the potential to negatively (or positively) impact project objectives. Primavera P6 Release 8.2 Professional includes an integrated Risk Management feature that enables you to...

Solving the problem with Primavera Contract Manager

 Primavera Contract Manager     Wouldn’t it be lovely if each of our problems would line up one-by-one? With Primavera Contract Manager, instead of trying to solve all of your project problems at once, you’re able to stay in control… Solve the problem- It happens in...

Primavera Training : Utilizing Thresholds in P6

What are thresholds in P6? A threshold is a user-defined trigger that identifies when the status of an activity has exeeded or is close to moving beyond an acceptable range. Thresholds are created by: Selecting a parameter ex. start date variance, cost variance, cost...

How To Utilize The Timescaled Logic Diagram

Step 1: Go to “Tools” and select Timescaled Logic Diagram. Step 2: Select the desired TSLD template from available Global or User templates.   Step 2a: You also have the availability to add, delete, duplicate, edit, import & export templates from this dialog box. Step...