How to manage risk in Primavera P6 Professional

Aug 15,2017
Risk Management in Primavera P6 Release 8.2 Risks are uncertain events/conditions that have the potential to negatively (or positively) impact project objectives. Primavera P6 Release 8.2 Professional includes an integrated Risk Management feature that enables you to...

Solving the problem with Primavera Contract Manager

Aug 15,2017
 Primavera Contract Manager     Wouldn’t it be lovely if each of our problems would line up one-by-one? With Primavera Contract Manager, instead of trying to solve all of your project problems at once, you’re able to stay in control… Solve the problem- It...

Primavera Training : Utilizing Thresholds in P6

Aug 15,2017
What are thresholds in P6? A threshold is a user-defined trigger that identifies when the status of an activity has exeeded or is close to moving beyond an acceptable range. Thresholds are created by: Selecting a parameter ex. start date variance, cost variance, cost...

How To Utilize The Timescaled Logic Diagram

Aug 15,2017
Step 1: Go to “Tools” and select Timescaled Logic Diagram. Step 2: Select the desired TSLD template from available Global or User templates.   Step 2a: You also have the availability to add, delete, duplicate, edit, import & export templates from this dialog...

Primavera Software Over-Allocated Resources

Aug 15,2017
Step 1: Access the ”Project Workspace” & select the “Customize” option to include the Over-allocated Resources portlet on the workspace Step 2: Review the resources listed in the Over-allocated Resources portlet Step 2a. Select one of the resources to view the...